Transportation construction projects are Prince’s core market and the focus of our business. Prince’s competitive market advantage is our ability to construct both greenfield and brownfield roadway projects utilizing internal resources such as Prince management, crews, and equipment for all the critical steps in the construction process.

Additionally, Prince’s self-performing business model gives us the ability to maintain construction schedules that gives us a competitive edge in the roadway construction market. The flexibility of this strategy allows us to strategically allocate our manpower and equipment to maximize efficiency. Our clients also enjoy the benefits of our flexibility to work with them as their needs change throughout a project.

The majority of Prince’s Transportation projects across Florida are for local and state authorities. Prince has worked with several major counties and we are also experienced with the Florida Department of Transportation statewide. These relationships and our reputation as a leading transportation contractor are the foundation that Prince will use to build partnerships with the public sector as innovative project delivery methods advance in transportation development.



Bruce B. Downs (CR 581)

Bruce B. Downs (CR 581)

OWNER: Hillsborough County Board of County Commissioners
VALUE: $ 36.1 million
ENGINEER:
YEAR COMPLETED: On-Going

 

This 3.55-mile, $36,148,000 project to reconstruct a four-lane rural roadway to an eight-lane urban roadway will last for 815 days.  Other work includes widening the southbound Cypress Creek Crossing bridge from two lanes to four, and constructing a brand new four-lane northbound bridge. Prince will also install a closed storm drainage system for the length of the project which includes four offsite storm drainage ponds, construct a retaining and gravity wall with handrails, install signing, pavement markings, signalization, and an Intelligent Transportation System (ITS).

 